ARUN-3 HEP ( 900 MW ) ,NEPAL SALIENT FEATURES |
|||||||
|
1. |
Location |
|
|||||
|
|
River |
Arun,a tributary of Kosi River in Eastern Nepal |
|||||
|
District |
Sankhuwasabha |
||||||
|
Nearest Railway Head |
Jogbani, Bihar ( B. Gauge ) about 300 km from project site |
||||||
|
Nearest Airport |
Tumlingtar, Nepal 70 km |
||||||
|
|
|||||||
|
2. |
Hydrology |
|
|||||
|
|
Catchment Area at Diversion Site |
26747 sq.km |
|||||
|
Design Flood |
PMF-8880 cumec GLOF-6830 cumec |
||||||
|
|
|||||||
|
3. |
Reservoir |
|
|||||
|
|
Submergence area at FRL |
66.3 Ha |
|||||
|
Reservoir Capacity/ Gross storage at FRL |
13.94 MCM |
||||||
|
Full Reservoir Level (FRL) |
El 845 m |
||||||
|
Max. Water Level (MWL) |
El 847.73 m |
||||||
|
MDDL |
El 835 m |
||||||
|
Inactive Storage (below MDDL) |
8.29 MCM |
||||||
|
Active storage /Peaking volume |
5.65 MCM |
||||||
|
|
|||||||
|
4. |
Diversion Tunnel |
429 m long, 11 m diameter to divert 1300 cumec |
|||||
|
|
|||||||
|
5. |
Dam |
|
|||||
|
|
Type of Dam |
Concrete Gravity Dam |
|||||
|
Dam top Level |
El.849 m |
||||||
|
River bed Level |
El. 790 m |
||||||
|
Dam Height above River bed |
59 m |
||||||
|
Deepest Foundation Level |
El.769 m |
||||||
|
Height above deepest Foundation Level |
80 m |
||||||
|
Length of Dam at Top |
233 m |
||||||
|
Top Width of Dam |
7 m |
||||||
|
|
|||||||
|
6. |
Upstream Coffer Dam |
|
|||||
|
|
Type |
Colcrete dam |
|||||
|
Top level |
El 818.00 m |
||||||
|
Height |
27 m |
||||||
|
Length |
108 m |
||||||
|
|
|||||||
|
7. |
Downstream Coffer Dam |
|
|||||
|
|
Type |
Rock fill dam |
|||||
|
Top level |
El 794.25 m |
||||||
|
Height |
5.25 m |
||||||
|
Length |
70.64 m |
||||||
|
|
|||||||
|
8. |
Spillway |
|
|||||
|
|
Design Flood |
PMF-8880 cumec GLOF -6830 cumec |
|||||
|
Energy Dissipation System |
Trajectory Bucket type |
||||||
|
i)Sluice spillway No. Size ii)Overflow spillway No. Size |
5 9.0 m (W)X 14.85 m (H)
1 4.0 m (W)X 3.0 m (H) |
||||||
|
Crest Level |
El 795 m-Sluice Spillway El 842 m-Overflow Spillway |
||||||
|
|
|||||||
|
9. |
Power Intake |
|
|||||
|
|
No. & Type |
2 Nos., Straight intake with bell mouth |
|||||
|
Invert Level |
El.819m |
||||||
|
Top Level |
El.849m |
||||||
|
|
|||||||
|
10. |
Intake Tunnels |
|
|||||
|
|
No. & Type |
2 Nos., 7 m diameter, horse-shoe shaped |
|||||
|
Length |
231 m each |
||||||
|
C.L. of Intake Tunnel |
El 822 m |
||||||
|
|
|||||||
|
11. |
Head Race Tunnel |
|
|||||
|
|
Shape & Size |
Horse-shoe, 9.5 m diameter |
|||||
|
Length of Tunnel |
11837 m |
||||||
|
Design Discharge |
344.68 cum / sec |
||||||
|
No. of Adits& size |
4 Nos.,7 m X 7 m D - shaped |
||||||
|
ADIT |
ADIT LENGTH |
RD OF HRT |
DISTANCE BETWEEN ADITS |
||||
|
1 |
504 m |
790 m |
|
||||
|
2 |
683 m |
5156 m |
4366 m |
||||
|
3 |
387 m |
8272 m |
3116 m |
||||
|
4 |
333 m |
11786 m |
3514 m |
||||
|
|
|||||||
|
12. |
Surge Shaft |
|
|||||
|
|
Size & shape |
Open to sky,Restricted Orifice 1No.,24.0m diameter, Circular |
|||||
|
Height |
155.00 m |
||||||
|
Top Level |
El 946.00 m |
||||||
|
Gates,No.& Size |
2 Nos., 5.5m ( W )X 5.5m (H ) |
||||||
|
|
|||||||
|
13. |
Butterfly Valve Chamber- Underground |
||||||
|
|
Size |
83.05m (L) X 12 m(W) X 21 m(H) |
|||||
|
Butterfly Valve |
2 nos, 5.5 m diameter |
||||||
|
|
|||||||
|
14. |
Pressure Shaft |
Underground, 2 Nos. |
|||||
|
|
Type & Size |
Circular,each 5.5 m dia bifurcating into two nos of 4.0 m diameter to feed four units |
|||||
|
Length of pressure shafts 1 and 2
|
|||||||
|
Pressure shaft-I |
432 m |
Pressure shaft-2 |
404 m |
||||
|
Branch 1 |
70 m |
Branch 3 |
70 m |
||||
|
Branch 2 |
58 m |
Branch 4 |
58 m |
||||
|
|
|||||||
|
15. |
Power House Complex |
|
|||||
|
|
Type |
Underground on left bank |
|||||
|
P/H Cavern |
179.50 m(L)X22.5 m (W)X49.5 m (H) |
||||||
|
Design Head ( net ) |
286.21 m |
||||||
|
Gross Head |
307.67 m |
||||||
|
Turbine |
4 Nos., Vertical Francis turbine, 225 MW each |
||||||
|
Rated speed of Turbine |
250 rpm |
||||||
|
Generation voltage |
15.75 kV |
||||||
|
Service Bay Floor Level |
El. 539.00m |
||||||
|
Generator Floor Level |
El. 534.00 m |
||||||
|
Turbine Floor Level |
El. 529.00 m |
||||||
|
Distribution Centre Line Level |
El. 525.00 m |
||||||
|
MIV Floor Level |
El.520.50 m |
||||||
|
Maximum Tail Water Level |
El. 536.46 m |
||||||
|
Transformer |
Single phase, 12+1 (Spare), 92 MVA 15.75 kV/420/Root3 kV |
||||||
|
|
|||||||
|
16. |
Transformer Hall |
|
|||||
|
|
Size |
146.14 m (L)X 16 m (W)x 23 m ( H ) |
|||||
|
Transformer Hall Floor Level |
El. 552 m |
||||||
|
Design Discharge per unit |
86.17 Cumec |
||||||
|
Design Energy in a 90 % dependable year |
3924.03 MU |
||||||
|
Annual Load Factor |
50.98 % |
||||||
|
Weighted average efficiency of TG Set |
93 % |
||||||
|
|
|||||||
|
17. |
Tail Race Tunnel |
|
|||||
|
|
No., Type & Size |
1 No., Horse-shoe shaped, 10.00 m diameter, 151.97 m long |
|||||
|
|
|||||||
|
18. |
Switchyard |
|
|||||
|
|
Elevation |
El 557 m |
|||||
|
Size |
160 m (L)X 80 m (W) |
||||||